Project Specification


SRS Royal Hills Phase 2 Project Specifications

Living Room/ Dining Room/ Lounge
  • Walls: POP Punning and OBD
  • Floor: Vitrified Tiles
  • Ceiling: POP Punning and OBD
  • Doors: External Doors UPVC Internal Door seasoned
  • Window/Glazing: UPVC Window
  • Others: Split A.C
  • Switches: Modular Switches
Master Bedroom
  • Walls: POP Punning and OBD
  • Floor: Vitrified Tiles
  • Ceiling: POP Punning and OBD
  • Doors: External Doors UPVC Internal Door seasoned
  • Window/Glazing: UPVC Window
  • Others: Split A.C
  • Switches: Modular Switches
Other Bedroom
  • Walls: POP Punning and OBD
  • Floor: Vitrified Tiles
  • Ceiling: POP Punning and OBD
  • Doors: External Doors UPVC Internal Door seasoned
  • Window/Glazing: UPVC Window
  • Others: Provision for Split A.C
  • Switches: Modular Switches
Kitchen
  • Walls: OBD Tiles
  • Floor: Tiles
  • Ceiling: POP Punning and OBD
  • Doors: Internal Door Seasoned hardwood frames with modular shutter
  • Window/ Glazing: UPVC Windows
  • Others: Modular Kitchen with chimney granite marble counter stainless steel skin cp fittings
  • Switches: Modular Switches
Balconies/ Terrace
  • Floor: Tiles
  • Ceiling: OBD
  • Switches: Modular Switches
Master Toilet
  • Walls: OBD/ Tiles
  • Floor: Tiles
  • Doors: Internal Door Seasoned hardwood frames with modular shutter
  • Window/ Glazing: UPVC Window
  • Other: Chinaware CP fitting and basin
  • Switches: Modular Switches
Other Toilet
  • Walls: OBD/ Tiles
  • Floor: Tiles
  • Doors: Internal Door Seasoned hardwood frames with modular shutter
  • Window/ Glazing: UPVC Window
  • Other: Chinaware CP fitting and basin
  • Switches: Modular Switches
Security
  • CCTV Gadgets giving around the check view of complex main gate and fire fighting system as per fire norms
Connectivity
  • Intercom system T.V Telephone points

No comments:

Post a Comment