SRS Royal Hills Phase 2 Project Specifications
Living Room/ Dining Room/ Lounge
- Walls: POP Punning and OBD
- Floor: Vitrified Tiles
- Ceiling: POP Punning and OBD
- Doors: External Doors UPVC Internal Door seasoned
- Window/Glazing: UPVC Window
- Others: Split A.C
- Switches: Modular Switches
Master Bedroom
- Walls: POP Punning and OBD
- Floor: Vitrified Tiles
- Ceiling: POP Punning and OBD
- Doors: External Doors UPVC Internal Door seasoned
- Window/Glazing: UPVC Window
- Others: Split A.C
- Switches: Modular Switches
Other Bedroom
- Walls: POP Punning and OBD
- Floor: Vitrified Tiles
- Ceiling: POP Punning and OBD
- Doors: External Doors UPVC Internal Door seasoned
- Window/Glazing: UPVC Window
- Others: Provision for Split A.C
- Switches: Modular Switches
Kitchen
- Walls: OBD Tiles
- Floor: Tiles
- Ceiling: POP Punning and OBD
- Doors: Internal Door Seasoned hardwood frames with modular shutter
- Window/ Glazing: UPVC Windows
- Others: Modular Kitchen with chimney granite marble counter stainless steel skin cp fittings
- Switches: Modular Switches
Balconies/ Terrace
- Floor: Tiles
- Ceiling: OBD
- Switches: Modular Switches
Master Toilet
- Walls: OBD/ Tiles
- Floor: Tiles
- Doors: Internal Door Seasoned hardwood frames with modular shutter
- Window/ Glazing: UPVC Window
- Other: Chinaware CP fitting and basin
- Switches: Modular Switches
Other Toilet
- Walls: OBD/ Tiles
- Floor: Tiles
- Doors: Internal Door Seasoned hardwood frames with modular shutter
- Window/ Glazing: UPVC Window
- Other: Chinaware CP fitting and basin
- Switches: Modular Switches
Security
- CCTV Gadgets giving around the check view of complex main gate and fire fighting system as per fire norms
Connectivity
- Intercom system T.V Telephone points
No comments:
Post a Comment